123 Remodeling.com

 
  • Increase font size
  • Default font size
  • Decrease font size
Home
Gold Coast Complete Gut and Rehab

Here we demolished the entire front room and bathroom. We installed new tiles, vanities, lights, shelves, bathtub, faucets and toilet. Rerouted the plumbing to accommodate a new drain location. Re framed the shower and bench with cement boards. Installed new shower tiles. Installed new tile flooring. Installed new shower heads and body sprays and faucets. Installed tempered glass doors and Constructed dividing walls with full closets in the 2nd bedroom and half closet in master bedroom. This job is currently in progress please stay tuned for additional updates regarding this project as we will upgrade the job's profile as it proceeds. 


 

www.123Remodeling.com
123 Remodeling.com